MOQ: | 1SET |
Standard Packaging: | WOODEN PALLET |
Delivery Period: | 10-15 DAYS |
Payment Method: | L/C, T/T |
Supply Capacity: | 100SETS/MONTH |
It is composed by one power unit, one idler unit , travel basement and control system. The slot is deigned on the rollers to fit the flange, to avoid painting damage when tower is rotated.
The basement is with manual travel device, the rollers are adjusted by bolt shift. We use the floor plug for the machine, due to the long distance of blasting area. After the rotator move to the position, connect the power to the nearest plug on the floor, to avoid use too much cables.
MOQ: | 1SET |
Standard Packaging: | WOODEN PALLET |
Delivery Period: | 10-15 DAYS |
Payment Method: | L/C, T/T |
Supply Capacity: | 100SETS/MONTH |
It is composed by one power unit, one idler unit , travel basement and control system. The slot is deigned on the rollers to fit the flange, to avoid painting damage when tower is rotated.
The basement is with manual travel device, the rollers are adjusted by bolt shift. We use the floor plug for the machine, due to the long distance of blasting area. After the rotator move to the position, connect the power to the nearest plug on the floor, to avoid use too much cables.